Update Avalanche Clearance at Gayari Sector Siachen – ISPR

Ground Penetrating Rader team has scanned a total of 176 points at various locations and indentified 44 points for excavation. 


Mean while excavation and physical search continues at all locations and all efforts are being made to maintain the pace of work. To augment the search and probe operation more Engineering plant equipment which include 19 excavators, Dozers and dumpers are on their way to Gayari.
Protection band is being made between artificial lake and avalanche to prevent inundation of excavated site.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s